What took 14 years to build?


What took 14 years to build? The Forbidden City took 14 years to build (from 1406 to 1420) and was built by over 1,000,000 workers, including more than 100,000 craftsmen. It was the imperial palace of China for 492 years (1420–1912) and was the home of 24 emperors — 14 of the Ming Dynasty and 10 of the Qing Dynasty.


What took 20 years to build?

The Great Pyramid of Giza It took around 20 years to finish and became the tallest structure in the world until the building of the Eiffel Tower. The surrounding pyramids create an astonishingly accurate alignment with the stars, making this construction truly unique.


What church took 600 years to build?

One year later, the king laid the cornerstone for the continued construction of the Cathedral. Cologne Cathedral was finally finished in 1880, 632 years after construction originally commenced. The completion of the church was celebrated on October 15.


What is the hardest building ever built?

The World's 10 Toughest Buildings
  • The Maeslantkering, Nieuwe Waterweg, Netherlands. ...
  • Akashi Kaikyo Bridge, Akashi Strait, Japan. ...
  • Shanghai Tower, Shanghai, China. ...
  • CCTV Building, Beijing, China. ...
  • One World Trade, New York, New York. ...
  • Torre Mayor, Mexico City, Mexico. ...
  • Taipei 101, Taipei, Taiwan.


What church took the longest to build?

Centuries of Work: 3 Cathedrals Whose Construction Lasted Longer Than Sagrada Familia
  • 632 Years: Cologne Cathedral (1248~1880) Now a popular site to visit in Germany, this gargantuan gothic structure took more than 600 years to finish. ...
  • 585 Years: St. Vitus Cathedral (1344~1929) ...
  • 579 Years: The Milan Cathedral (1386~1965)


What building took 140 years to build?

The Sagrada Família, has been under construction for 140 years, with the work beginning back in 1882. It's now in the final phase, and it is expected to be fully completed by 2030 or 2032. The architectural style of the Sagrada Familia is Catalan Modernism and has an influence of the Spanish Gothic style.


What took 10 years to build?

Construction of the Suez Canal The excavation work took 10 years, and an estimated 1.5 million people worked on the project.


Which church took 500 years to build?

This giant Gothic cathedral, which until its completion in 1880 had been under construction for over 500 years, is perhaps Germany's most famous religious structure and includes two huge towers that serve as the defining symbol of Cologne's skyline.


What church took 144 years to build?

The prized pinnacle on Gaudi's masterpiece won't be finished for another 11 years. It will only have taken 144 years to complete. But the massive construction site at the Sagrada Familia Basilica in Barcelona hasn't kept tourists from coming in droves; it's the Catalonian city's most popular destination.


What church took more than 250 years to build?

The York Minster Cathedral Built in medieval times, this is the one of the biggest cathedrals of the era. It took 252 years to complete. Construction began in 1220 and ended in 1472.


What took 30 years to build?

The Arc de Triomphe is an iconic symbol of French national identity and took 30 years to build. The Tour de France bicycle race ends near it each year, and the annual military parade marking July 14—known both as French National Day and Bastille Day—begins its journey at the arch.