What are they doing on the A30?
What are they doing on the A30? What work is being done on the A30? As part of National Highways' A30 Chiverton to Carland Cross upgrade, work will take place to realign traffic on a gyratory under new structures across the existing roundabout, ahead of work to align and elevate the new A30 dual carriageway across the junction.
How much did the Chiverton to Carland Cross cost?
Highways England's proposals for the Chiverton to Carland Cross improvement scheme were accepted for formal examination by the Planning Inspectorate in September 2018. Work started in 2021, projected to last at least until 2023, with the overall scheme costing £330 million.
What is the longest road in the UK?
The A1 also known as the Great North Road is the longest numbered road in the United Kingdom, at 410 miles (660 km). It connects London, the capital of England, with Edinburgh, the capital of Scotland.
How far is the A30 from London to Lands End?
The A30 is a major road in England, running 284 miles (457 km) WSW from London to Land's End.
What is the new route of the A30 Cornwall?
The preferred route provides a new dual carriageway running to the north of the existing A30 between Chiverton and Chybucca and to the south between Chybucca and Carland Cross. It includes: a 70mph high quality dual carriageway. a new roundabout at Chiverton Cross built on 2 levels to allow traffic to flow freely.