Is the Sumner Tunnel work completed?


Is the Sumner Tunnel work completed? From Fall 2023 to Summer 2024, the tunnel will be closed periodically. Another 2-month closure of the tunnel will occur summer 2024. This second 2-month closure will be followed by weekend closures to complete the project by end of 2024.


Is the tunnel to Logan Airport underwater?

The tunnel is 8,448 feet (2,575 m) long, of which approximately 3,960 feet (1,210 m) are underwater. A toll is collected in both directions, through the E-ZPass electronic toll collection system, formerly named the Fast Lane system.


What Boston tunnels are under water?

The Ted Williams Tunnel interface in East Boston between the land-based approach and the underwater section is 90 feet below the surface of Boston Harbor, the deepest such connection in North America. The project's seven-building ventilation system is one of the largest highway tunnel ventilation systems in the world.


Is Sumner Tunnel under construction?

The Sumner Tunnel is undergoing a restoration that began in the spring of 2022. This work requires the tunnel to be closed to traffic periodically.


Does Callahan tunnel go both ways?

It carries motor vehicles from the North End to Logan International Airport and Route 1A in East Boston. Ordinarily, this tunnel is only used to carry traffic out of the city, and with the completion of the Big Dig it only collects traffic from I-93 southbound and downtown Boston.


Is Callahan Tunnel underwater?

It was originally a two-way road that carried traffic in both directions, until the opening of the parallel Callahan Tunnel in 1961. The tunnel is 8,448 feet long, of which approximately 3,960 feet are underwater. In 2017, the state removed the tollbooths as part of a switch to electronic tolling.


Why is the Boston tunnel closed?

The Sumner Tunnel is undergoing a restoration that began in the spring of 2022. This work requires the tunnel to be closed to traffic periodically.


How far under water is the Sumner Tunnel?

Opened to traffic June 30, 1934. It was originally a two-way road that carried traffic in both directions, until the opening of the parallel Callahan Tunnel in 1961. The tunnel is 8,448 feet long, of which approximately 3,960 feet are underwater.


Are the Sumner and Callahan tunnels the same?

The Sumner Tunnel was opened on June 30, 1934. It carried traffic in both directions until the opening of the parallel Callahan Tunnel in 1961. The Sumner Tunnel is named for William H. Sumner, the son of Governor Increase Sumner.


How do I get out of Logan Airport without paying toll?

You need to drive towards Revere on Route 1A and take the first exit (it comes quickly). Take the Chelsea Street Bridge from Route 145 out of the airport. Then cut through the industrial blight and get to Route 99, where you'll take the Malden Bridge to freedom.


Is the Sumner Tunnel closed in fall 2023?

From Fall 2023 to Summer 2024, the tunnel will be closed periodically. Another 2-month closure of the tunnel will occur summer 2024.


Which tunnel is the Callahan Tunnel?

The Lieutenant William F. Callahan Jr. Tunnel (colloquially Callahan Tunnel) is one of four tunnels, and one of three road tunnels, beneath Boston Harbor in Boston, Massachusetts. It carries motor vehicles from the North End to Logan International Airport and Route 1A in East Boston.