Is Sumner Tunnel under construction?
Is Sumner Tunnel under construction? The Sumner Tunnel is undergoing a restoration that began in the spring of 2022. This work requires the tunnel to be closed to traffic periodically.
Are there free buses in Boston?
Overview. Starting March 1, 2022, Route 23, 28, and 29 bus riders are able to board at all doors without paying a fare for two years. From March 1, 2022 through February 29, 2024, MBTA Routes 23, 28, and 29 will be free for all riders.
When were the Callahan and Sumner tunnels built?
They were in fact built decades apart, the Sumner in 1934, and the Callahan in 1961.
Why is Sumner Tunnel closed?
The Sumner Tunnel is undergoing a restoration that began in the spring of 2022. This work requires the tunnel to be closed to traffic periodically.
What tunnel in Boston is underwater?
The Ted Williams Tunnel interface in East Boston between the land-based approach and the underwater section is 90 feet below the surface of Boston Harbor, the deepest such connection in North America. The project's seven-building ventilation system is one of the largest highway tunnel ventilation systems in the world.
How far under water is the Sumner Tunnel?
Opened to traffic June 30, 1934. It was originally a two-way road that carried traffic in both directions, until the opening of the parallel Callahan Tunnel in 1961. The tunnel is 8,448 feet long, of which approximately 3,960 feet are underwater.
Is the subway free in Boston?
The subway the fare is $2.50, and bus fare is $2.00 when paid in cash or using the paper Charlie Ticket. If you use a CharlieCard, the subway fare is $2.00, and the bus costs 1.50. You can get an empty CharlieCard from an MBTA Customer Service Agent at certain T stations, or online.
Is Callahan Tunnel same as Sumner Tunnel?
The Sumner Tunnel was opened on June 30, 1934. It carried traffic in both directions until the opening of the parallel Callahan Tunnel in 1961. The Sumner Tunnel is named for William H. Sumner, the son of Governor Increase Sumner.
Is the Sumner Tunnel closed in fall 2023?
From Fall 2023 to Summer 2024, the tunnel will be closed periodically. Another 2-month closure of the tunnel will occur summer 2024.
Why was the Sumner Tunnel built?
The tunnel was constructed to handle automobile traffic from the North End of Boston to East Boston. The tunnel opened in 1935. Also included are three parcel maps with corresponding lists of property taken for “Haymarket Square Improvement.”
Which tunnel is the Callahan Tunnel?
The Lieutenant William F. Callahan Jr. Tunnel (colloquially Callahan Tunnel) is one of four tunnels, and one of three road tunnels, beneath Boston Harbor in Boston, Massachusetts. It carries motor vehicles from the North End to Logan International Airport and Route 1A in East Boston.
Was the Sumner Tunnel part of the Big Dig?
The Big Dig separated the co-mingled traffic from the Massachusetts Turnpike and the Sumner and Callahan tunnels.