How much did the Big Dig cost inflation?


How much did the Big Dig cost inflation? However, the project was completed in December 2007 at a cost of over $8.08 billion (in 1982 dollars, $21.5 billion adjusted for inflation, meaning a cost overrun of about 190%) as of 2020.


Does the blue line go underwater?

Perhaps ironically, the Blue Line takes several points of pride from its proximity to water, which gives it its name. Local historians claim the tunnel that runs under the harbor as the first underwater subway tunnel in the United States.


Is Callahan Tunnel underwater?

It was originally a two-way road that carried traffic in both directions, until the opening of the parallel Callahan Tunnel in 1961. The tunnel is 8,448 feet long, of which approximately 3,960 feet are underwater. In 2017, the state removed the tollbooths as part of a switch to electronic tolling.


Did the Big Dig reduce traffic?

The Central Artery/Tunnel Project was the largest, most challenging highway project in the history of the United States. It reduced traffic and improved mobility in one of America's oldest, most congested major cities. It built a framework for continued growth in Massachusetts and New England.


What was the criticism of the Big Dig?

With interest, the project could ultimately cost around $24 billion, finally getting paid off in 2038. Besides creating a financial nightmare, the Big Dig was plagued by huge constructional flaws – which obviously added fuel to the fiscal firestorm.


How was the Big Dig financed?

Salvucci vowed not to follow the Robert Moses tradition of leveling neighborhoods in the name of progress. The Big Dig, a project funded by federal and stated monies (about 60/40), was substantially completed late in 2007 for nearly $15 billion.


What replaced the central artery in Boston?

The Boston's Big Dig project replaced the elevated deteriorating six-lane elevated Central Artery (I-93) with an underground expressway beneath the existing road, extended the I-90 tollway underground to the South Boston Seaport and Logan International Airport, built a new 10-lane bridge over the Charles River, and ...


Who went to jail for the Big Dig?

Aggregate provided 60% of the concrete used to build the Big Dig. Indicted were: former general manager Robert Prosperi; dispatch manager Marc Blais; dispatch manager John Farrar; quality control manager McNally; district operations manager Gregory Stevenson; and dispatch manager Keith Thomas.


How much concrete did the Big Dig use?

The project placed 3.8 million cubic yards of concrete. That's enough to build a sidewalk three feet wide and four inches thick from Boston to San Francisco and back three times. The project installed more than 26,000 linear feet of steel-reinforced concrete slurry walls.


Is UK traffic getting worse?

And our roads are getting worse every year. According to Inrix, drivers spend more time stuck on gridlocked streets in London than in any other city on the planet. In 2022, our road hogs lost a whopping 156 hours each to congestion. (Up from 148 hours in 2021, and 5 percent higher than pre-pandemic levels.)