How much did it cost to build the California high speed rail?


How much did it cost to build the California high speed rail? The price tag for the rail system has risen to $128 billion, according to a California High Speed Rail Authority project update report — a nearly 22% uptick from the previous figure of $105 billion from last year and a far cry from the $33 billion cost voters approved in 2008.


How much did the high speed bullet train cost?

New cost figures issued in an update report from the California High-Speed Rail Authority show that the plan to build the 171-mile initial segment has shot up to a high of $35 billion, exceeding secured funding by $10 billion.


How much was Brad Pitt for Bullet Train?

Variety reported that Pitt was paid $20 million. Joey King subsequently entered negotiations for a supporting role, while in September, Andrew Koji was added, with Aaron Taylor-Johnson and Brian Tyree Henry joining in October.


Does the bullet train make a profit?

For example, most of the companies that run Japan's Shinkansen or bullet train lines operate at a profit, as do some fast trains on France's state-owned SNCF network.


How much did the German high-speed rail cost?

The new line reduced travel time by train between Berlin and Munich from 6 hours to 3 hours and 55 minutes. Construction began in 1996 and cost about €10 billion ($11.8 billion), making it the most expensive transport project in Germany since reunification.


How much did it cost Japan to build high-speed rail?

Eighty percent of the 286 kilometers (177 mile) Maglev bullet train track will be located underground, passing under urban sprawl and mountainous terrain. The project is expected to cost the equivalent of 55 billion dollars.


How much did the China high-speed rail project cost?

China's high speed rail with a maximum speed of 350 km/h has a typical infrastructure unit cost of about US$ 17-21m per km, with a high ratio of viaducts and tunnels, as compared with US$25-39 m per km in Europe and as high as US$ 56m per km currently estimated in California.


How much did the bullet train project cost?

New cost figures issued in an update report from the California High-Speed Rail Authority show that the plan to build the 171-mile initial segment has shot up to a high of $35 billion, exceeding secured funding by $10 billion.


Is high-speed rail in Europe profitable?

From a financial standpoint, only two HSR lines in the world are profitable: Paris-Lyon in France and Tokyo-Osaka in Japan. A third line, Hakata-Osaka in Japan, breaks even. The majority of high-speed rail lines require large government subsidies from both general taxpayers and drivers.


How much would it cost to build a high-speed rail system in USA?

Amtrak estimates that it would cost $500 million per mile to turn its Northeast Corridor route into a true high-speed system. At these prices, it would cost at least $1 trillion to build a national HSR system, and likely much more. High-speed rail is the “fetch” of transportation ideas.


What is the most profitable railroad?

BNSF Railway leads the market The railroad focuses on transporting freight commodities such as coal, industrial or agricultural products. In 2022, the company generated some 24.49 billion U.S. dollars in freight revenue and hauled more than 10 million carloads across the country.


Who funded the California high speed rail?

the Federal Railroad Administration's (FRA) High-Speed Intercity Passenger Rail (HSIPR) Program, which was launched in 2009. California's high-speed rail project received federal funding through the HSIPR program under the American Recovery and Reinvestment Act of 2009 (ARRA) and the Consolidated Appropriations Act, ...


How much would it cost to build a high-speed rail system?

The 2022 business plan estimates that the full, 500-mile high-speed system between Los Angeles and San Francisco will cost as much as $105 billion, up from $100 billion two years ago. In 2008, when voters approved a bond to help build the railroad, the authority estimated that the system would cost $33 billion.


Is high-speed rail profitable?

He said there are only a few examples of high-speed rail networks that turn a profit, due to a rare combination of passenger numbers and distance. For example, most of the companies that run Japan's Shinkansen or bullet train lines operate at a profit, as do some fast trains on France's state-owned SNCF network.


Will California high speed rail be profitable?

This chart displays the Breakeven Analysis on Phase 1 of the high-speed rail system assuming the horizon year of 2040, showing a 99.4 percent probability that Phase 1 would be profitable between $0 to $5.7 billion and a 0.6 percent chance of deficit between $220 million and 0.


Why doesn t California have high-speed rail?

California's plan is to build an electric train that will connect Los Angeles with the Central Valley and then San Francisco in two hours and 40 minutes. But 15 years later, there is not a single mile of track laid, and executives involved say there isn't enough money to finish the project.


Is China losing money in high-speed rail?

According to the latest data, as of the first half of 2022, the total liabilities of China National Railway Group totaled 6 trillion yuan, and in the first half of 2022 alone, it has lost 80.4 billion yuan, with an average loss of 400 million yuan per day.


Why won t America invest in high-speed rail?

Highways (as well as aviation) became the focus of infrastructure spending, at the expense of rail. This trend has continued, and not the least because highways require continuous maintenance, while the US's growing population demands more lanes and roads to relieve congestion.