How long is the Big Dig in Boston?


How long is the Big Dig in Boston? The new underground expressway has eight to ten lanes. In total, the project built 161 lane miles of highway, about half in tunnels, and four major highway interchanges in a 7.5 mile corridor.


Is Callahan Tunnel underwater?

It was originally a two-way road that carried traffic in both directions, until the opening of the parallel Callahan Tunnel in 1961. The tunnel is 8,448 feet long, of which approximately 3,960 feet are underwater. In 2017, the state removed the tollbooths as part of a switch to electronic tolling.


How long is the tunnel in Boston closed?

From Fall 2023 to Summer 2024, the tunnel will be closed periodically. Another 2-month closure of the tunnel will occur summer 2024.


How deep is the tunnel in Boston?

The Ted Williams Tunnel interface in East Boston between the land-based approach and the underwater section is 90 feet below the surface of Boston Harbor, the deepest such connection in North America. The project's seven-building ventilation system is one of the largest highway tunnel ventilation systems in the world.


How much did the Boston Big Dig originally cost?

The original estimated cost was $2.8 billion. The final project cost was $14.6 billion. The Boston Globe estimates the Big Dig will ultimately cost $22 billion (with interest) and that it won't be paid for until 2038.


Is the Sumner and Callahan Tunnel the same?

The Sumner Tunnel was opened on June 30, 1934. It carried traffic in both directions until the opening of the parallel Callahan Tunnel in 1961. The Sumner Tunnel is named for William H. Sumner, the son of Governor Increase Sumner.


What is the deepest tunnel in Boston?

Introduction. The Ted Williams Tunnel was part of the “Big Dig” project to update Boston's Central Artery highway system and was the largest architectural feat of the project. At 90ft deep below the harbor, it is the deepest tunnel in North America.


Why is the MBTA in debt?

The MBTA's debt comes from three sources — $1.85 billion from spending since the 2000 start of forward funding, $1.65 billion that was transferred to the MBTA under forward funding and was related to previous transit projects, and $1.7 billion in funding for projects mandated under a Big Dig-related agreement.


How far underwater is the Callahan Tunnel?

It was originally a two-way road that carried traffic in both directions, until the opening of the parallel Callahan Tunnel in 1961. The tunnel is 8,448 feet long, of which approximately 3,960 feet are underwater. In 2017, the state removed the tollbooths as part of a switch to electronic tolling.


What tunnel in the US goes underwater?

The Chesapeake Bay Bridge–Tunnel (CBBT, officially the Lucius J. Kellam Jr. Bridge–Tunnel) is a 17.6-mile (28.3 km) bridge–tunnel that crosses the mouth of the Chesapeake Bay between Delmarva and Hampton Roads in the U.S. state of Virginia. It opened in 1964, replacing ferries that had operated since the 1930s.


Who went to jail for the Big Dig?

Aggregate provided 60% of the concrete used to build the Big Dig. Indicted were: former general manager Robert Prosperi; dispatch manager Marc Blais; dispatch manager John Farrar; quality control manager McNally; district operations manager Gregory Stevenson; and dispatch manager Keith Thomas.