Are landing fees fixed or variable?
Are landing fees fixed or variable? Landing and tie down fees - Landing fees and tie down fees associated with aircraft usage are considered variable costs. Tie down fees for storing an aircraft at its base of operations should be considered part of operations overhead, a fixed cost.
Which is not a fixed cost?
Direct material cost is not a fixed cost; instead, it is a variable cost because this cost varies with the level of output.